Residential Project
Premise Analysis
Preparatory stage:
Two months before fitting out works
Purpose:
apply this service could help you a better aware of some fitting out problems.
Two months before fitting out works
Purpose:
apply this service could help you a better aware of some fitting out problems.
STEP 1 Outline requirement
Client to provide essential information, including daily habit, loved interior style, fitting out requirement and details.
STEP 2 Premise inspection
Conduct a comprehensive assessment of the existing Electrical and Mechanical (E&M) systems and overall site conditions. Perform comparisons with fitting-out regulations, keeping in mind that hidden areas may not be fully accessible for inspection.
STEP 3 Predict visual defects
Provide a report of building defects for client to estimate the fitting out cost.
Space Planning
Preparatory stage:
Fitting out / renovation works
Purpose:
Plan the area to fit your requirement
Fitting out / renovation works
Purpose:
Plan the area to fit your requirement
STEP 1 Personal life style
Client provide their habits and requirement and discussion with designer of their needs
STEP 2 Scope Of Works
Provide 2-3 major spaces planning for budget estimate.
How to spend the resources to maximum usage.
How to spend the resources to maximum usage.
Interior Design
Preparatory stage:
After receiving the keys and paid deposit
Purpose:
solid the finishing and details after demolition
After receiving the keys and paid deposit
Purpose:
solid the finishing and details after demolition
Provide Details information
Client provide information include client items which would be move to new home and further equipment/ loose furniture size.
This step is want to provide details to create comfortable environment for living.
This step is want to provide details to create comfortable environment for living.
Visual Design
Provide 2D/3D drawings with materials scheme.
Details Adjust
Solve the problems between fitting out work sand site condition after demolition.
Provide final construction drawings to client for confirmation.
Provide final construction drawings to client for confirmation.
Project Management
Progress Status:
During fitting out / renovation works
Purpose:
Monitoring the workmanship and timing control
During fitting out / renovation works
Purpose:
Monitoring the workmanship and timing control
Risk Assessment
Find out any potential problems during site inspection and report to our customer.
Method Statement
Provide solutions for the problems issue. Teams follow the unique instruction and Work together.
Time Management
Carry out the works by detail schedule and provide the working process report to client. Chase the status of materials delivery
Quality Control
Some critical steps would do the QC test.
Arrange a lots of site inspection to monitor the outputs
Arrange a lots of site inspection to monitor the outputs